[ARFC] Upgrade Safety Module with StkGHO

Following ARFC Snapshot deadline, the following proposal has passed with both Quorum (320K YAE votes) and Option B as winning option with 411K votes. So Option B has passed as the chosen option.

Option B

Parameter Current Parameters Proposed Parameters
Cooldown 10 Days 20 Days
Budget 30 AAVE/day 50 AAVE/day
4 Likes